国产精品久久久久久精品电影_黄色免费一级视频_国产亚洲成AⅤ人片在线观看_欧美激情一区二区三级高清视频,色欲久久九色一区二区三区,亚洲精品国产精品国自产,久久久久久久精品妇女99

Brick making machine industry NEWS

Your location:HOME > Information dynamic  > News > Brick making machine industry

What are the correct operating methods for hydraulic systems that brick machine manufacturers tell y

source:www.bjzyzh.com         Release time:2024-06-25 Return list

    In the new type of brick machine manufacturers, hydraulic systems are widely used because of their good stability and strong operating power. However, in the production of hydraulic brick machines, as the main power system of brick machine production, if there is a problem with the hydraulic system, it will directly affect the production of the whole machine. On the one hand, we need to avoid discovering such faults, which requires us to study relevant operation and maintenance knowledge seriously. On the other hand, we also need to master some knowledge of hydraulic system fault maintenance. When we really encounter some problems, we can discover and handle them in a timely manner to avoid increasing the fault and causing greater losses. In order to enable investors to operate better, we will introduce the correct operation methods of hydraulic systems in brick machine manufacturers.


    The correct operation methods for various debugging projects and systems are carried out item by item from parts to the entire system, namely: component, single machine, unit linkage, etc. The brick machine manufacturer tells you that the debugging of the hydraulic system of the hydraulic non burning brick machine should generally be carried out in the order of pump station debugging, system debugging (including pressure and flow rate, i.e., speed debugging of the actuator, and action sequence debugging). The hydraulic system of a brick press equipped with an accumulator should have the working pressure setting value of the accumulator consistent with the working pressure value of the actuator it controls. When the accumulator is installed in the hydraulic pump station of the non burning brick machine, its pressure adjustment value should be 0.4-0.7 MPa lower than the set pressure value of the relief valve.


    Run without load for 10-20 minutes, and when starting the hydraulic pump of the non burning brick machine, loosen the relief valve or place it in the unloading position to allow the system to run without pressure. Observe the magnitude of the unloading pressure; Whether the operation is normal; Whether there is harsh noise; Whether the liquid level in the oil tank has too much foam, and whether the oil level is within the specified range.
主站蜘蛛池模板: 若尔盖县| 瑞昌市| 隆回县| 卢湾区| 崇阳县| 施秉县| 江达县| 乐昌市| 开平市| 桐城市| 定安县| 土默特左旗| 门源| 滦南县| 微博| 略阳县| 高安市| 大化| 庆元县| 景泰县| 安岳县| 辽宁省| 义马市| 托克逊县| 合江县| 峨边| 兰溪市| 雅安市| 高雄市| 福泉市| 浮山县| 将乐县| 临朐县| 德昌县| 安丘市| 鱼台县| 宁南县| 阳江市| 吴堡县| 河池市| 监利县|